Works

Our track record in projects for the industry of oil, gas, energy and infrastructure It is based on a story that begins in 1987, evolving throughout more than three decades.

PTC LAS – AESA
Within the framework of the PTC LAS – AESA project, at our operational base we processed more than 17,000 m² of exterior pipe painting intended for drainage, water, gas, crude oil and fire protection services.
VMOS – Vaca Muerta Oil Sur
We participated in tasks related to the VMOS (Vaca Muerta Oil Sur) project, a large-scale energy infrastructure project that includes the construction of an oil pipeline over 430 km long.
Cutral-Co Skate Park
We worked on the public works project at the Cutral Co Skate Park, adding value to a heavily used urban space. We improved the park's aesthetics and incorporated paint systems with better adhesion, optimizing safety and performance.
Oldelval
En el marco de los trabajos realizados para Oldelval en Fénix Aplicadores S.R.L. ejecutamos tareas de preparación de superficie utilizando una granalladora portátil de circuito cerrado.